BESS / ESS · USK ENERGYREQUIREMENTS QUESTIONNAIRE
Input data for payback calculation and BESS sizing
This saves your time. The more data you provide, the more accurate the financial model and technical proposal from our engineer will be.
1Customer and site
| Company / site | |
| Full name | |
| Position | |
| Phone | |
| Site city / region | |
| Site type |
2Primary business goal (multiple allowed)
3Energy parameters
| Maximum load | Whole site: kW · Critical only: kW |
| Monthly consumption | kWh/month · Current tariff: UAH/kWh |
| Target BESS capacity | kWh (or desired autonomy time: h) |
4Topology and grid
| Transfer time to backup | |
| Voltage class on site | |
| Existing solar / genset | Solar PV: kW Diesel genset: kVA |
5Installation
| Installation location |
6Scope, timeline and budget
| What you need from us | |
| Preferred timeline | |
| Indicative budget |
7Additional information
Briefly describe your situation, existing metering (AMR) or grid-connection constraints:
Want to learn more or see delivered projects?
Visit BESS.com.ua
If you have a single-line diagram (SLD) or load profiles, send them to sales@usk.ua
for the most accurate financial model.
for the most accurate financial model.